Tuesday, January 26, 2016

Flush With Progress

I'm getting used to winter, I think. When it's in the 20s, I can go outside to take out the trash or get something out of the car and only feel chilly. (Of course, I only stay out for a couple minutes.) And this week the highs are going to be in the 30s, so a couple layers and a regular coat will do me just fine.

New bathroom turning blue.
Old bathroom…ewww

The biggest thing to happen this last week was getting the toilet and sink installed in the guest bath. On Sunday, I went to Menard's and got the paint for the bath and arranged to have Mark from Eagle Eye pick up the fixtures on Monday, which he did. I painted the wall in the bathroom so it would be done before Mark showed up.

It took most of the day to get the fixtures in and the plumbing hooked up, but he did have time left to install a new kitchen faucet. The old one was from the '60s, sort of crusty and the volume of flow was very hard to control. The new one has a removable head that toggles from stream to spray. Getting the new one installed was no problem, Mark said, but getting the old one out was a struggle.

Sink before and after.
So, by the time he left, things were up and running. I now have 3 1/4 baths again (full bath upstairs, half bath on the main floor and 3/4 bath in the basement). I was almost giddy when, responding to a natural urge, I got to inaugurate the new toilet. It's one of those that has a small flush and a large flush. Slowly, the modern conveniences of the 21st century are being incorporated into the house.

After all the hesitation about colors for the house, I've made the first choice with the bathroom. The color seemed on the lighter side when I chose it, and I calculated that I could do the entire room with two quarts, but after painting the wall (maybe a quarter of the wall space), I had used up a full quart, and there were still touch ups needed. So, it's back to Menard's to pick up a gallon more.

Other fun things for the week: I got an answer to my e-mail from the community theater, with the tech director offering a stagehand position for the next show in the season. The tech is in early March with a two-week run. I answered back and accepted. Well aware of what a headache volunteer workers can be, starting with a backstage position is the way to do the least damage to a production if I turned out to be a disaster.

And this Thursday, we have the first meeting of the Center's communications committee this year. We have a couple of marketing interns from UW-L, so I'm excited about what innovations they can bring to the various platforms on which we work. Then Saturday is the annual breakfast for the Center, something for which I will have to get up early.

The first week of February will bring another dentist's appointment, and we'll talk about that later.